• 0 Posts
  • 12 Comments
Joined 10 months ago
cake
Cake day: September 2nd, 2023

help-circle









  • Yeah that’s part of my worry, my gas boiler is 10+years old so needs replacing at some point soon, Id be up for going to a heat pump, but I don’t really have the space for it out side. Guess I might just go for a top of the line gas boiler before they stop selling them (I mean I assume they will gradually phase them out so no new installs, only replacements of existing ones, then nope) to cover the next decade and hope for some smaller units.



  • Would be a nice thing to have in the spec for the cable, as those ones aren’t compliant with the spec, and can in some cases cause problems, like on disconnect it might be possible for one of the PD pins to short against one of the data pins before the side delivering power has had time to process the disconnect.

    It’s a pretty specific edge case and I’m sure not a problem most people have had or will run into, but would be nice if it could be part of the spec.