First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

  • LouNeko@lemmy.world
    link
    fedilink
    English
    arrow-up
    11
    arrow-down
    3
    ·
    1 year ago

    We don’t necessarily have to use batteries. In mountainous regions we already have stations that use surplus power to pump water up a mountain and then drop it down to generate energy when needed. Its basically a potential energy battery. But this is usually location limited and more expensive to set up.

    • BastingChemina@slrpnk.net
      link
      fedilink
      English
      arrow-up
      7
      ·
      1 year ago

      Yes, Pump Storage Hydroelectricity is a great option for storage. It’s not the most efficient but it allows to store massive amount of energy.

      I think today it’s the main utility scale storage solution in the world.

    • charles@lemmy.world
      link
      fedilink
      English
      arrow-up
      4
      arrow-down
      10
      ·
      1 year ago

      You’re describing dams, and basically all the good locations are taken already.