NPCI is building two 700MW pressurised heavy water reactors (PHWR), including Units 3 and 4 at Kakrapar, where there are two 220MW power plants. Officials say that in July, the fourth unit recorded 97.56% progress.
Wonder why they’re building these instead of thermal coal plants
We’ve had several net positive fusion tests. I believe they’re possible. The science is there. How long it takes is another matter.
deleted by creator