• Getawombatupya@aussie.zone
    link
    fedilink
    English
    arrow-up
    1
    ·
    edit-2
    1 year ago

    Countries with a lower PPP would get the lifetime cost closer to parity, if a handful of project experts etc are brought in at Western rates and local labour is used for the build and operation. If the federal system of government for that country streamlines the registration process while mandating key critical compliance steps (for instance, full test and verification on the containment system but not the light switch in the control room toilets, which I have read is an issue with the US regs) it would seem that non-us countries would be able to do nuclear cheaper per MWh.

    • abraxas@lemmy.ml
      link
      fedilink
      English
      arrow-up
      1
      ·
      1 year ago

      Cheaper than $140, or cheaper than Solar? Someone just got back to me with claims of lower Nuclear numbers… and even in those claims, Nuclear simply could not get anywhere close to Solar.